The approach

The waste can be cleaned where it lies. Six steps, each with a test agreed in advance.

Measure, clean, process, recover, press bricks, return the land. Nothing is shipped between islands. Mercury is captured, the sand becomes bricks and the land goes back to the village.

The approach

From mine-waste heap to living land in six steps.

Every heap follows the same chain. Every step has a test agreed in advance. What has not been measured, we do not claim.

  1. ESMI technicians sampling a waste heap with the handheld XRF1

    Measure

    Satellite, field and lab establish what each heap contains. XRF (a handheld X-ray scanner that reads metals in seconds) screens on site; the shaking table and the lab measure. Plus a baseline for people and nature.

    ESMI XRF field kit
  2. Waste heap before treatment2

    Clean

    The crew sprays POCO and ESMI microbes on the cell and into the process water. The microbes make mercury a solid, heavy compound so it can be removed, and break down cyanide. POCO helps them multiply.

    ESMI microbes
  3. Design render: a wheel loader takes waste from a heap to feed the planned 10-tonner3

    Process

    The 10-tonner crushes, grinds and separates on site, in a closed water circuit. No transport of hazardous waste between islands.

    The 10-tonner
  4. Two shaking tables sorting heavy minerals into coloured trays4

    Recover

    The shaking table separates the solid mercury from the sand. It is packed and stored safely, as the Minamata Convention requires. Metals go to a bullion bank (a bank that buys and stores gold).

  5. Pallets of blocks pressed from cleaned residual sand at the 10-tonner5

    Bricks

    All residual sand, bound with cement, becomes paving and wall bricks, cold-cured. Every batch is tested for leaching (TCLP, the standard leaching test) and strength (≥ 10 MPa).

  6. Restored land with green terraces and clear water6

    Restore and reuse the land

    Only when soil and water meet the standard does the land go back to the village or landowner: eco-parks, forest, cassava fields, agroforestry, water and eco-tourism.

    New land

One site, from start to finish

A site typically moves from mine-waste heap to a new land use within a few years.

One site, from mine-waste heap to returned landSix stages of one site over time. 1 Mine-waste heap. 2 Measure: satellite, field and lab. 3 Clean and process on site with the 10-tonner, ESMI microbes and POCO. 4 Clean sand pressed into bricks. 5 Soil and water tested to the standard. 6 Land returned with a new use: eco-park, forest, cassava fields, agroforestry, water and recreation, or eco-tourism.1Waste heapMine waste withmercury and cyanide2MeasureSatellite, field (XRFscreening) and lab3Clean & processOn site: 10-tonner,ESMI microbes, POCO4BricksClean sand pressedinto bricks5TestedSoil and water meetthe standard6Land returnedWith a new useNew usesEco-parkForestCassavafieldsAgroforestryWater &recreationEco-tourismOne site, from mine-waste heap to returned landSix stages of one site over time. 1 Mine-waste heap. 2 Measure: satellite, field and lab. 3 Clean and process on site with the 10-tonner, ESMI microbes and POCO. 4 Clean sand pressed into bricks. 5 Soil and water tested to the standard. 6 Land returned with a new use: eco-park, forest, cassava fields, agroforestry, water and recreation, or eco-tourism.1Waste heapMine waste with mercury and cyanide2MeasureSatellite, field (XRF screening) andlab3Clean & processOn site: 10-tonner, ESMI microbes, POCO4BricksClean sand pressed into bricks5TestedSoil and water meet the standard6Land returnedWith a new useNew usesEco-parkForestCassavafieldsAgroforestryWater &recreationEco-tourism
The land goes back to the community only after soil and water meet the standard.

The pilot proves six things before any scale-up

Mercury made solid and removed
Mass balance within ±15%; residue below the Indonesian leaching limit (TCLP-B)
Cyanide broken down
WAD cyanide (cyanide that can still dissolve) < 0.5 mg/L
POCO and microbes work
Double-blind, treated against untreated
Bricks are safe
Every batch below the Indonesian leaching limit (TCLP-B) and ≥ 10 MPa
Throughput and cost
≥ 49,640 t/yr per unit (tested on the first 10-tonner, planned 2027); ≤ USD 36.80 per tonne
People
Village consent, zero serious accidents

Gotong royong

The pilot is under way. The next step is scale.

The pilot in Bolmong has started. ESMI is now raising large-scale funding to clean up Indonesia’s mine waste. Investors can start with one 10-tonner (USD 1.7 million).

ESMI also works as a hired partner. Mining companies and cooperatives can bring in ESMI to upgrade an existing plant with its microbes and methods, so it recovers more and can move away from mercury and cyanide.