Skip to content
ESMIEco Sustainable
Mining Initiative
Language
Cassava fields on restored land

Products

From mine waste to bricks and flour.

The clean-up leaves two things people can use: clean sand that becomes bricks, and restored land where cassava grows for MOCAF flour. Both are made near the site, by people from the villages.

Bricks

All residual sand becomes brick. The market sets the pace.

Treatment leaves clean sand. Bound with cement, it becomes paving for roads and squares and wall blocks for houses and schools. Acid-forming sand is first treated by ESMI microbes, then locked in cement. Every batch is tested for leaching and strength before it leaves the plant.

Builders lay grey wall blocks from cleaned sand on a new house, with stacks of blocks on a pallet in front

Paving block, 6 cm

per tonne of sand
9.1 m²
cement
22 kg per m²

For roads and squares; the plan assumes 70% paving.

Wall block, 10 × 20 × 40 cm

per tonne of sand
109 blocks
cement
1.8 kg per block

For houses, schools and village buildings.

  • TCLPthe standard leaching test, on every batch
  • ≥ 10 MPacompressive strength, every batch
  • ABA/NAGacid tests; acid-forming sand treated by microbes, locked in cement

One unit yields sand for 315,891 m² of paving a year or 1.62 million wall blocks a year.

Supply exceeds demand

19 % of the blocks can be sold on the market in the 10-year roll-out. The other blocks go into road foundations and fill old mining pits, so nothing goes back on a heap.

Market capacity per region

How many 10-tonners each region can absorb the bricks of.

Cement 64.9 Mt (ASI 2024) × regional share (Katadata 2021) × 10% to bricks (assumption) × 5 kg sand per kg cement × 25% ESMI market share.
Show the numbers as a table
RegionCement, Mt/yrMax. sales, t/yrUnits it can absorb
Sumatra14.01,752,30039
Sulawesi6.5811,25018
Kalimantan4.2527,31312
Bali–Nusa Tenggara3.6454,30010
Maluku–Papua2.1259,6006

Who buys

  • Roads and squaresregencies, provinces and contractors, paving first
  • Schools and village buildingsDana Desa and regency projects
  • Social housing9.3 million households are waiting for a home (PUPR backlog, March 2026)
  • PUPR and BUMNpublic works and state-owned groups such as MIND ID, for their own sites

Sell first, then build.

Every hub starts only with offtake contracts in hand: roads, schools and social housing.

Regional data and model Source: Business plan, annex B; model sheets Bricks and Brick market (key figures, 18 Nov 2026); ASI 2024; Katadata 2021; PUPR backlog March 2026. Cement use per brick derived; to be confirmed in the pilot.

Rows of cassava on restored land

MOCAF

Cassava from restored land, flour from a factory.

Once a cleaned cell passes its release test, the flat parts can become cassava fields. The roots go to a nearby factory and are turned into MOCAF: modified cassava flour. The flour is made indoors, in a clean and controlled hall, never on open drying racks.

What MOCAF is

MOCAF is cassava flour improved by controlled fermentation with microbes. Fermentation takes away the bitterness, improves the aroma and makes the flour absorb more water and bind better. It behaves closer to wheat flour, and it stays gluten-free, high in fibre and free of chemical additives.

Where it is used

  • Bread and cakes
  • Noodles and pasta
  • Snacks and coatings
  • Gluten-free and plant-based food

From field to flour

  1. 1Release testmercury below 1 mg/kg in soil and first harvest
  2. 2Cassava fieldson flat, cleaned land, up to 15° slope
  3. 3Factory, indoorspeel, ferment, dry with electric dryers, mill
  4. 4MOCAF flourfor bakeries, noodles, food industry

Why it fits restored mine land

  • Cassava is tough

    It tolerates heat, drought and poor soil, needs little water and hardly any fertiliser.

  • Food security

    Wheat supplies about a fifth of the calories people eat and comes from a few exporting countries. Local flour reduces that dependence.

  • Local value

    Grow, process and use locally: fields for the village, jobs in the factory, flour for local bakeries and noodle makers.

  • Experience in the chain

    SBDI Foundation, ESMI’s founding partner, works on cassava value chains. Eko Vitaris represents the Indonesian MOCAF brands Ladang Lima and Rumah Mocaf internationally.

The numbers so far

  • 1,000 ha

    of cassava supply one MOCAF factory

    Model estimate, to be measured
  • 40 jobs

    in each factory, plus 0.5 job per hectare of field

    Model estimate, to be measured
  • 1,100 USD/ha/yr

    net income for the village from cassava and the MOCAF value added

    Regional data and model
  • 8,060 ha

    of restored land suited to cassava in Kalimantan (6,900) and Sumatra (1,160)

    Model estimate, to be measured

Regional data and model Source: Land-use analysis “Infrastructure and land-use plan”, 7 Nov 2026 (§ 5.2, restoration model v1.4: USD 1.14 mln per 1,000 ha, 13 t/ha); Bolmong restoration options (design study, 30 Oct 2026); article by Guido Lassally (Medium, 2025). Jobs after clean-up to be tested against the Bolmong pilot and existing MOCAF factories.

Recovered metals

Metals are a by-product, not the business case.

Where the shaking table recovers metal, it goes to an Indonesian bullion bank. The proceeds are shared per site under the site contract, and royalties go to the state. The programme is paid per verified tonne and does not depend on metal.

Gotong royong

The pilot is under way. The next step is scale.

The pilot in Bolmong has started. ESMI is now raising large-scale funding to clean up Indonesia’s mine waste. Investors can start with one 10-tonner (USD 1.7 million).

ESMI also works as a hired partner. Mining companies and cooperatives can bring in ESMI to upgrade an existing plant with its microbes and methods, so it recovers more and can move away from mercury and cyanide.