Skip to content
ESMIEco Sustainable
Mining Initiative
Language
An ESMI 10-tonner site: block wall, closed gate, solar-roofed hall and green wind-turbine poles

Invest

Finance a 10‑tonner. Put a clean‑up unit to work.

For investors who want to finance at least one ESMI 10-tonner: USD 1.7 million per complete unit, 49,640 tonnes of mine waste cleaned per year and 26 legal jobs on site.

Inside the ESMI 10-tonner: the green spiral separator feeding two shaking tables

The unit

One complete plant in a walled yard, on wind, sun and the grid.

The 10-tonner will clean mine waste on site (planned 2027) without mercury or cyanide. It will treat ten tonnes an hour in two shifts.

  • 1.7M USD

    per complete unit, including set-up

    ESMI programme model, key figures, Nov 2026

  • 10t/h

    throughput per unit

    ESMI machine specification

  • 49,640t/yr

    mine waste cleaned per unit per year

    ESMI programme model, key figures, Nov 2026

  • 26

    permanent jobs per unit, at least 80% from nearby villages

    ESMI programme model, key figures, Nov 2026

How a unit is paid

Paid per verified tonne, not per promise.

The unit is paid from the clean-up itself. Funders such as development banks, governments and climate funds pay a fixed fee for every tonne that is cleaned and independently verified.

  1. Funders pay per verified tonne

    A fixed clean-up fee per verified tonne, set open-book on a cost-plus basis: on average USD 39.20 per tonne over ten years.

  2. ESMI owns and runs the unit

    The machines are owned and operated by ESMI and financed over five years. ESMI organises the work, the crews and the reporting.

  3. The investor finances the unit

    The investor provides the financing for one or more complete units. The terms are set in a contract, never on this page.

  4. Money only on results

    Payments run through a ring-fenced account and are released per verified tonne and milestone.

FigureValueSource
Price per complete unitUSD 1,700,000ESMI programme model, key figures, Nov 2026
Average clean-up feeUSD 39.20 per verified tonne, over ten yearsESMI programme model, key figures, Nov 2026
Throughput49,640 t per unit per yearESMI programme model, key figures, Nov 2026
Financing period of the machinesFive yearsESMI programme plan

The fee covers all costs, including staff, site set-up, training and reporting, and is reviewed every year. Figures are programme estimates, not forecasts of any investor result.

Investor app · Full transparency

Your machine, live: every tonne, every gram.

Every ESMI 10-tonner will have sensors linked to the ESMI app. As an investor you see at any moment how much is processed, at what grade, what comes out after refining and what you earn.

09:41
My ESMIInvestor account
ENIDIN
My machineESMI-10T-01 · Bolmong · heap B2
Running
Feed grade now
2.08 g/t
= 2.08 ppm Au · XRF on the feed belt, every 2 min
10.1 t/hthroughput196 ttoday94 %uptime
Grade through the process
Feed2.08 ppm
Concentrate (shaking table)35 ppm
Tailings after microbes0.82 ppm
Bar after refining999.9 ‰ Au
This month
Processed3,912 t
Gold recovered4.62 kg
Mercury captured0.31 kg
Your share this month (so far)
USD 88k
15 % of gross gold revenue · paid monthly
LiveGradesPayoutsSite
09:41
My ESMIInvestor account
ENIDIN
Grades & labEvery batch, XRF and lab
Live
Feed grade, last 24 h (g/t)
Batches
B2-0412 · XRF 2.1 · fire assay 2.04 g/tVerified
B2-0413 · XRF 1.9 · labPending
Bar ESMI-0012 · 999.9 · 1,002.4 gSealed
Sensors on this machine
Belt scaleXRF feedConcentrate scalepH / ORPWater flowHg vapourPowerGPSCCTV: calibrate in 3 d
Site
Heap B2 cleaned62 %
When the heap is clean, the next heap goes in. Your right stays with the machine.
LiveGradesPayoutsSite

What you see, per machine

  • Grade at every moment: g/t (= ppm) of the feed, live from the belt.
  • ppm through the process: concentrate, tailings and the bar after refining.
  • Tonnes and gold: per hour, day and month.
  • Mercury captured and water quality.
  • Your share and payouts, with a monthly statement.
  • Where your machine is, and how clean the heap is.

How we keep it honest

  • Sensors are calibrated; the XRF is checked every morning with a reference sample.
  • ESMI labs on site do the daily analyses. Unisma (Malang), an accredited lab, checks about 10 % of the samples and grows our microbes. Everything is done in Indonesia.
  • The gold room works with a two-person rule and a camera; bar weights match the bullion bank.
  • Every reading is time-stamped and stored, and cannot be edited afterwards.

Monthly statement · example at 2 g/t

Processed (belt scale)5,100 t
Feed grade (fire assay)2.0 g/t
Gold recovered (bars, bank weight)6.0 kg
Gold price (bullion bank)USD 128/g
Gross gold revenueUSD 768k
Your 15 %USD 115k
  1. 1 · Feedbelt scale + XRFt/h · g/t
  2. 2 · Grindpower + throughputt/h
  3. 3 · Shaking tableconcentrate scale + XRFppm concentrate
  4. 4 · ESMI microbespH, ORP, flow, Hg vapourppm tailings
  5. 5 · Gold roomscale, XRF bar check, camera‰ after refining

Example screens (design) of the ESMI investor app. Figures on the screens are illustrative, at our 2 g/t lower bound.

Excavators in a polluted mining area, North Sulawesi

Where it works

Where every dollar avoids the most damage.

Units go first to the regions where damage avoided per dollar is highest and where roads, power and water are already in place. In the top ten regencies, every dollar of clean-up avoids about USD 5.1 of damage to health, water and land.

  • Top provinces in the model: Central Kalimantan, West Kalimantan, Jambi and Riau.
  • Sites with road access, power and water first.
  • Only where the government has designated the site and the village has given consent.

Source: This is a societal benefit-cost ratio (8% discount rate, 20 years, conservative), not a return for investors. ESMI program model, Nov 2026.

Risk factors

Read these before any conversation. The information pack covers each in detail.

  • Funding timing

    Fee payments depend on funders committing on time. Delays in funding delay the work.

  • Technology proven in the pilot first

    The method is being proven in the Bolmong pilot. If a test fails, the method changes before any scale-up.

  • Site permits and consent

    A unit works only on a designated site with permits and village consent. Both can take longer than planned.

  • Regional costs

    Transport, fuel, labour and logistics differ per region and can raise the cost per tonne.

  • Market for bricks

    Bricks and paving from cleaned sand need local buyers. Demand can be lower than expected.

Safeguards for investors

Built in from the start, for funders and investors alike.

  • Ring-fenced account

    Money for each unit and site is kept apart and released only against verified results.

  • Independent verification

    Every tonne is verified independently before it is paid.

  • External audit

    An external auditor checks costs and revenue every year.

  • Insurance

    Machines and operations are insured.

The process

Five steps to a signed term sheet.

  1. Intro call

    A first conversation about your aims and the programme.

  2. NDA

    A mutual non-disclosure agreement.

  3. Investor information pack

    Model, contracts, risks, safeguards and site data.

  4. Site visit to the pilot

    See the pilot in Bolmong, North Sulawesi, with the team.

  5. Term sheet

    Terms for one or more units, after due diligence.

Request the investor information pack.

Tell us who you are and how many units you are considering. We reply with a date for an intro call.

Not an offer of securities and not investment advice. Read our claims and disclaimers

Request the investor information pack