Pilot Bolmong · live

The pilot has started. Six tests decide what comes next.

In Bolaang Mongondow, North Sulawesi, the province has allocated 100 ha for the first ESMI site. The cooperative is being built, two small machines start on the richest heaps, and every test result is published here. The clean-up plan for the heaps is ready: each heap is split into cells that are scanned and sampled with the ESMI XRF software.

LivePreparing: 5 · Running: 1 · Result published: 0Status board

The pilot in numbers

The first site, set up to grow.

  • 100ha

    allocated by the Province of North Sulawesi for the pilot site

    Provincial allocation, 2026

  • 2× 0.5 t/h

    small machines that start on the richest heaps first

    ESMI pilot plan, 2026

  • 6

    public tests the pilot must pass before any scale-up

    ESMI pilot protocol

  • 1

    first 10-tonner, to follow once the pilot succeeds and funding is in place

    ESMI programme plan

The licensed mining area in North Sulawesi where ESMI runs its pilot
The licensed mining area in North Sulawesi where ESMI runs its pilot

Status board

Six tests, in public.

Each test has a target that is set before the work starts. A test moves to “Result published” only when the lab has confirmed the result and the report is online.

  • Preparing5
  • Running1
  • Result published0
  1. 01Preparing

    Mercury made solid and removed

    Pass mark
    Mass balance within ±15%; residue below the Indonesian limit in the standard leaching test (TCLP-B)
    Now
    Baseline sampling plan and site lab set-up
  2. 02Preparing

    Cyanide broken down

    Pass mark
    WAD cyanide (cyanide that can still dissolve) < 0.5 mg/L
    Now
    Sampling points and lab method being fixed
  3. 03Preparing

    POCO and ESMI microbes work

    Pass mark
    Double-blind, treated against untreated
    Now
    Test plots and control plots being laid out
  4. 04Preparing

    Bricks are safe

    Pass mark
    Every batch below the Indonesian leaching limit (TCLP-B) and ≥ 10 MPa
    Now
    Waits for the first cleaned sand
  5. 05Preparing

    Throughput and cost

    Pass mark
    ≥ 49,640 t/yr per unit (tested on the first 10-tonner, planned 2027); ≤ USD 36.80 per tonne
    Now
    Small machines being configured; cost booking open-book from day one
  6. 06Running

    People

    Pass mark
    Village consent, zero serious accidents
    Now
    The cooperative is being built on site

Results are published per test, including negative results. XRF (a handheld X-ray scanner that reads metals in seconds) screens samples in the field; the lab measures. One in ten samples is checked by the accredited Unisma lab.

Timeline

From one site to the first 10-tonner.

  1. 2026

    Done

    Site allocated

    The Province of North Sulawesi allocates 100 ha for the pilot.

  2. 2026

    Under way

    Cooperative building

    The local cooperative (KUD) is set up to run the work with ESMI.

  3. 2026

    Next

    Small machines

    Two 0.5 t/h machines start on the richest heaps first.

  4. 2027

    Next

    First 10-tonner

    Only if the six tests pass and funding is in place.

  5. 2027

    Next

    Samples in 3–4 more regions

    Screening and lab work to prepare the next sites.

ESMI team member crouching on rocky ground and scanning a loose white stone with the XRF, hammer beside him

How the pilot works

Measured, cleaned, tested, published.

The pilot runs the full ESMI chain at small scale, so every step can be checked before money goes into large machines.

  • XRF screens every heap in the field; the site lab and the accredited Unisma lab measure.
  • The whole site is treated first: ESMI microbes make mercury solid so it can be removed and break down cyanide.
  • POCO is the stimulator: it feeds and activates the microbes, it cleans nothing by itself.
  • Cleaned sand is tested for leaching and strength before it becomes bricks.
  • No mercury, no cyanide, no explosives in the process.

Field diary

Notes from the site.

Short entries from the pilot, added as the work moves on. No coordinates and no names: the site and the people on it are protected.

  1. A hand holding a rock sample taken from a waste heap
    2026

    Richest heaps first

    Two small 0.5 t/h machines start on the richest heaps. Samples are screened with XRF in the field and measured in the lab.

  2. ESMI founder and a local partner giving a thumbs-up at a meeting table
    2026

    The cooperative starts building

    The local cooperative (KUD) is being built. It will run the work on site with ESMI, with crews from the surrounding villages.

  3. Two people from the field team walking over bare, reworked ground below forested hills
    2026

    The province allocates the site

    The Province of North Sulawesi allocates 100 ha for the pilot. The site is walked on foot before any plan is drawn.

New entries follow as the pilot moves on. Test results appear on the status board only after lab confirmation.

No scale-up on promises. The pilot either proves it, or we change the method.

ESMI pilot protocol

Gotong royong

The pilot is under way. The next step is scale.

The pilot in Bolmong has started. ESMI is now raising large-scale funding to clean up Indonesia’s mine waste. Investors can start with one 10-tonner (USD 1.7 million).

ESMI also works as a hired partner. Mining companies and cooperatives can bring in ESMI to upgrade an existing plant with its microbes and methods, so it recovers more and can move away from mercury and cyanide.