Financing

Paid per verified tonne. Open books. No unit and no year runs at a loss.

±92% of the gold waste land lies outside any permit. There is no liable party to pay. Without international finance, this waste will not be cleaned up. The programme combines grants, a national fund and private finance.

Every month of delay costs Indonesia about USD 46 million in damage. USD 548 mln a year ÷ 12 · ESMI national report on Indonesia’s mine waste § 13.5

The request: a first phase of USD 40.7 million.

USD 40.7 mln

phase 1, 2027–2028

USD 12.1 bn

full programme 2027–2036 in current prices, incl. 10% contingency, VAT, verification and price increases; base in 2026 prices USD 8.16 bn

Grant or loan to government

World Bank, ADB, or GEF through UNDP, UNEP or UNIDO. Government is the recipient; ESMI is the implementing partner under the funder’s procurement rules.

National fund

BPDLH manages domestic and international environmental funds and pays on verified results.

Private finance

IFC, FMO, green and sharia banks finance the machines and factories on ESMI’s balance sheet.

Payment per verified tonne and milestone, through a ring-fenced account. Every site has a 20% buffer.

Results per dollar

What USD 1 million delivers

  • 22,100t

    mine waste processed, mercury made solid and removed

    Estimate · Business plan § 1.3

  • 12ha

    land cleaned and returned to the village

    Estimate · Business plan § 1.3

  • 2.5

    permanent jobs, former miners first

    Estimate · Business plan § 1.3

  • 2.7–4.7×

    damage avoided per dollar, mercury heaps first: health and environment only, up to forest, carbon and nature included

    Estimate · Business plan § 1.2

Step by step

Three phases

Go/no-go between phases: throughput, cost per tonne, mercury balance, brick tests, village consent and an independently confirmed baseline.

How the money flows

No verified tonne, no payment.

Every dollar follows the same path, and every step is checked. Nothing is paid before an independent verifier has confirmed the work.

  1. 1

    Funders

    Grants, loans, funds and investors commit to a phase or a site.

  2. 2

    Ring-fenced account

    One separate account per funder; money cannot be used elsewhere.

  3. 3

    Work on site

    Tonnes processed, mercury made solid and removed, bricks made, hectares restored.

  4. 4

    Independent verification

    An accredited verifier checks tonnes, hectares and milestones; Unisma checks the science.

  5. 5

    Payment per tonne

    A fixed, open-book fee per verified tonne (on average USD 39.20 over ten years).

  6. 6

    Audit and report

    External audit every year; results per site published.

Where metal is recovered

A share goes to the cooperative, landowners and the province, agreed per site and reported publicly every year. The programme does not depend on it.

Business plan §§ 4.1–4.4 and 5.1.

A mine-waste heap above rice paddies and a village
Mercury, rice paddies and a village on one slope: this is where each dollar does the most.

Priorities

Where each dollar avoids the most harm

The programme starts where mercury, people and accidents converge and where roads and power are already in place. There, clean-up avoids far more damage per dollar than the national average.

  • ±5.1×

    damage avoided per dollar in the ten worst-affected regencies

    EstimateConservative method: 8%, 20 years

  • ±3.7×

    in the twenty worst-affected regencies

    EstimateConservative method: 8%, 20 years

  • USD 58 mln

    damage avoided per year in the top ten, for about USD 168 mln in clean-up

    EstimateBusiness plan, regional analysis

Most damage avoided per dollar in Central Kalimantan, West Kalimantan, Jambi and Riau. Estimates; the scan in Java, Sulawesi and Bali-Nusa Tenggara is checked in the field first. The full list per regency is available on request.

The funders

Who contributes

ESMI organises the work and brings the finance together. Government designates sites, grants permits and access, and can act as recipient of international funds; how costs are shared is agreed per site.

Permit holders

Have a legal duty and a guarantee fund. ESMI implements; the fund pays.

State companies (BUMN, Danantara)

Clean up their own concessions first, including illegal mining on them, and buy bricks.

Carbon and biodiversity credits

Reforestation and restored nature on cleaned land help pay for management.

International funders

World Bank, ADB, GEF, climate funds and blended finance (public money that reduces the risk for private investors) cover the gap for land without a liable party.

Doing nothing is the most expensive option.

The damage repeats every year; the clean-up is paid once, per verified tonne.

The comparison

Clean-up against doing nothing

Value
Damage if nothing is doneUSD 548 mln per year
Damage avoided by cleaning upUSD 273 mln per year
Damage avoided per dollar, mercury heaps first: conservative±2.7×
Damage avoided per dollar, mercury heaps first: full±4.7×
Damage avoided per dollar, zero waste: conservative±0.5×
Damage avoided per dollar, zero waste: full±0.9×

Source: Business plan §§ 1.2, 4.1–4.6. Conservative: avoided health and environmental damage only, 20 years, discounted at 8%. Full: 30 years at 3.5%, plus half of the lost forest services, carbon and biodiversity on restored land. Costs are the same in both. Bricks and jobs come on top.

Legal structure

Nine parties. One role and one contract each. Every payment verified.

Each party has one role and its own contract. Donor money is held in a separate project account and released only after independent verification. Machines and factory sit in separate companies, so they can serve as collateral.

How one dollar travels

  1. 1Fundersloan or grant
  2. 2Project accountheld separately
  3. 3Verifierchecks tonnes, hectares, milestones
  4. 4Payment per tonneto PT Eko Vitaris International
  5. 5Leases, crews, Unismamachine companies, local implementers, lab

One contract per layer

  • Framework contract with the executing agency: fee per tonne, milestones, safeguards, disputes
  • Escrow and verification agreement with funder, bank and verifier
  • Site contract with cooperative, permit holder and landowner, with the village’s consent
  • Lease or ijarah for the machines; licences for POCO, microbes and app
  • Offtake contracts for the bricks

Board with independent members and an audit committee, IFRS accounts with an external auditor, beneficial-owner reporting, an anti-corruption policy with a whistle-blower line, and a grievance mechanism on every site.

Proposal · to be agreed Source: Business plan § 3.3. Proposed structure, to be reviewed by an Indonesian lawyer and tax adviser; UU 3/2020, PP 96/2021, PP 22/2021, Perpres 10/2021, Kepmen ESDM 365/2026, World Bank Procurement Regulations (2023).

Cost per tonne

The cost of one tonne, line by line.

One 10-tonner is designed to treat 49,640 tonnes a year. Every dollar of the cost per tonne is accounted for, from the machine lease to the microbes. The programme’s fee is cost-based and paid only per verified tonne.

USD 36.80

total cost per tonne treated

27.77 operating costs + 9.03 machine lease, written off in five years

Machine and lease USD 12.56 34 %Site, hub and logistics USD 12.09 33 %People and safety USD 5.25 14 %Energy USD 2.47 7 %Process, environment and community USD 4.42 12 %

All cost lines, USD per tonne

  1. Lease (USD 1.7 mln machine, 5 years)9.03
  2. Regional surcharge (location, roads, wages)4.04
  3. Staff of the 10-tonner (16 FTE + roster reserve)2.76
  4. Plant power (wind, sun and grid)1.40
  5. Site set-up; moving the equipment to the next site2.58
  6. Fixed site costs, camp and security2.42
  7. Unit maintenance2.05
  8. Hub, head office and government relations1.72
  9. Re-treating batches that fail the test (B3 handling)1.61
  10. Camp, food and administration1.55
  11. Lab and QA (fire assay, TCLP, strength, ABA/NAG acid tests, mercury/HCN)1.20
  12. Diesel for digging and feeding1.07
  13. Transport from heap to unit1.00
  14. Safety and training (PPE, medical, K3, academy)0.95
  15. Grinding media and wear parts0.78
  16. Mercury capture, B3 disposal and safe storage0.60
  17. Other reagents0.50
  18. Import duties on parts and IT licences0.44
  19. Insurance0.34
  20. Excavator and crusher maintenance0.25
  21. POCO (process water)0.20
  22. Community, FPIC and grievance mechanism0.15
  23. Restoration per released cell (POCO, planting)0.10
  24. ESMI microbes (cultured by Unisma, cold chain)0.06

Energy assumes 20 kWh per tonne until the pilot measures.

Show the numbers as a table
Cost lineGroupUSD/t%
Lease (USD 1.7 mln machine, 5 years)Machine and lease9.0324.5
Regional surcharge (location, roads, wages)Site, hub and logistics4.0411.0
Staff of the 10-tonner (16 FTE + roster reserve)People and safety2.767.5
Plant power (wind, sun and grid)Energy1.403.8
Site set-up; moving the equipment to the next siteSite, hub and logistics2.587.0
Fixed site costs, camp and securitySite, hub and logistics2.426.6
Unit maintenanceMachine and lease2.055.6
Hub, head office and government relationsSite, hub and logistics1.724.7
Re-treating batches that fail the test (B3 handling)Process, environment and community1.614.4
Camp, food and administrationPeople and safety1.554.2
Lab and QA (fire assay, TCLP, strength, ABA/NAG acid tests, mercury/HCN)Process, environment and community1.203.3
Diesel for digging and feedingEnergy1.072.9
Transport from heap to unitSite, hub and logistics1.002.7
Safety and training (PPE, medical, K3, academy)People and safety0.952.6
Grinding media and wear partsMachine and lease0.782.1
Mercury capture, B3 disposal and safe storageProcess, environment and community0.601.6
Other reagentsProcess, environment and community0.501.4
Import duties on parts and IT licencesMachine and lease0.441.2
InsuranceSite, hub and logistics0.340.9
Excavator and crusher maintenanceMachine and lease0.250.7
POCO (process water)Process, environment and community0.200.5
Community, FPIC and grievance mechanismProcess, environment and community0.150.4
Restoration per released cell (POCO, planting)Process, environment and community0.100.3
ESMI microbes (cultured by Unisma, cold chain)Process, environment and community0.060.2

Model estimate, to be measured Source: Business plan, annex A; calculation model scenario C (key figures, 18 Nov 2026); price sources 6 Nov 2026 (UMP, PLN I-3, diesel, TCLP PNBP); infrastructure analysis v3 (991 gold sites) for the regional surcharge.