Skip to content
ESMIEco Sustainable
Mining Initiative
Language
A restored mine with water terraces and young forest

Step 6 · New land

When the soil and water are clean, the land goes back to the village.

Clean-up does not end with bricks. Once soil and water meet the standard, the village or landowner takes the land back with a management plan. The community decides what it becomes.

An open mine crater with bare terraces and excavators, surrounded by rainforest
The same place after restoration: clear water terraces, waterfalls and green banks
TodayAfter restoration

Drag to compare: the same place before and after restoration.

A stream through a former family gold mine in Katingan, Central Kalimantan: the starting point for new land.
A stream through a former family gold mine in Katingan, Central Kalimantan: the starting point for new land.

Step 6

Restore and reuse the land.

Clean-up does not end with bricks. Once soil and water meet the standard, the land returns to the village or landowner with a management plan. The community chooses how it is used.

  • Hikers on a forest trail along a green ridge, with a volcano in the distance

    Eco-parks

    Terraces, trails and native planting on former heaps.

  • Cassava fields on restored land

    Cassava fields

    Food and income on restored land; processing into flour takes place indoors in a factory.

  • Fruit garden and young forest

    Agroforestry and forest

    Fruit trees, timber and native forest that hold soil and water.

  • A clear river through restored forest

    Water and recreation

    Former pits become clear water, after water and soil meet the standard.

  • Maleo bird

    Nature

    Habitat for endemic species such as the maleo.

Why new land matters

Land with a new use and a new income is the best protection against illegal mining coming back. Forest and nature bring back water, soil and shade; fields and parks bring work. Satellite monitoring continues after restoration, and carbon and biodiversity credits help pay for management.

Satellite monitoring continues after restoration. Carbon and biodiversity credits help pay for management.

Gotong royong

The pilot is under way. The next step is scale.

The pilot in Bolmong has started. ESMI is now raising large-scale funding to clean up Indonesia’s mine waste. Investors can start with one 10-tonner (USD 1.7 million).

ESMI also works as a hired partner. Mining companies and cooperatives can bring in ESMI to upgrade an existing plant with its microbes and methods, so it recovers more and can move away from mercury and cyanide.