A fruit garden on restored mine land

Interactive tool

Plan a site.

Pick a region, a type of mine waste and what the land should become. The model shows what it takes and what it gives back, from the first tonne to the last tree.

A first sketch in one minute

This tool runs on the same numbers as the ESMI business plan. It does not replace a site study: it gives a first, honest order of magnitude. It starts with an example site (a rich heap of 2 ha): pick your own waste type and set your own size. Every result shows its source.

Two routes

Rich heaps and white heaps go through the 10-tonner. Waste rock and alluvial sand are restored where they lie: levelled, cleaned with POCO and ESMI microbes, and planted.

Regional prices

Roads, the power grid, the brick market and wages differ per region. The cost follows the location factor of the region you choose.

Land first

You decide what the land becomes. Forest, cassava for MOCAF (fermented cassava flour), fruit trees, water, eco-tourism or building land.

1Region

Location factor: ×1.10 machine route · ×1.02 in situ

2Type of mine waste
3Size

Model density for this type: 27,042 t per ha. ≈ 54,100 t

4New land use

The sliders always add up to 100%.

Site plan (schematic, not a map)

Now

After

  • Mine waste: Rich small heaps
  • Forest 54%
  • Cassava fields 9%
  • Agroforestry and fruit 5%
  • Eco-park and water 25%
  • Eco-tourism 7%

The clean-up

  • 54,100

    tonnes through the 10-tonner

    2 ha

    Estimate · Source: ESMI business-plan key-figures model, scenario C (7 Nov 2026); 16.55 Mt on 612 ha (a_mt_t1 / a_ha_t1)

  • 1.09

    unit-years of machine time

    13 machine-months

    Estimate · Source: ESMI business-plan key-figures model, scenario C (7 Nov 2026); a_t_jaar (10 t/h, 2 shifts, uptime)

  • 1

    10-tonners to finish in 5 years

    Finished in about 1.1 years.

    Estimate · Source: ESMI business-plan key-figures model, scenario C (7 Nov 2026); a_t_jaar (10 t/h, 2 shifts, uptime)

  • USD 2.3 mln

    clean-up cost

    USD 42.06 per tonne in this region.

    Estimate · Source: ESMI business-plan key-figures model, scenario C (7 Nov 2026); cost per tonne, rich small heaps only (scenario C, 18 Nov 2026)

  • USD 290,000

    site set-up for the 10-tonner

    Part of the clean-up cost above, shown on its own.

    Estimate · Source: ESMI business-plan key-figures model, scenario C (7 Nov 2026); micro-level analysis: median USD 292,000 for 384 machine sites

  • 344,000

    m² of paving from residual sand

    plus 1,760,000 batako blocks. All processed material, bound with cement, becomes bricks once it passes the leach test.

    Estimate · Source: ESMI business-plan key-figures model, scenario C (7 Nov 2026)

  • 26

    jobs during the clean-up

    26 at the 10-tonners, 0.2 in restoration.

    Estimate · Source: ESMI business-plan key-figures model, scenario C (7 Nov 2026); unit_kern

  • 20,900

    tonnes of residue containing mercury, made solid and removed

    Mercury is captured, stored safely and removed as hazardous waste (B3).

    Estimate · Source: ESMI business-plan key-figures model, scenario C (7 Nov 2026); 6.39 of 16.55 Mt (a_mt_tromol / a_mt_t1)

After restoration

  • 2

    hectares of new land

    Estimate · Source: ESMI business-plan key-figures model, scenario C (7 Nov 2026); 16.55 Mt on 612 ha (a_mt_t1 / a_ha_t1)

  • 1,300

    seedlings planted

    Estimate · Source: ESMI national restoration model v1.4 (S2, P50)

  • 8.6

    t CO₂ a year taken up (from year 5)

    Estimate · Source: ESMI national restoration model v1.4 (S2, P50); below the world mean of 13.6 for poor mine soil

  • 2.3

    t fresh cassava a year

    Estimate · Source: ESMI national restoration model v1.4 (S2, P50)

  • 0.6

    t MOCAF flour a year

    Made indoors in a factory (one per ±1,000 ha; this site fills <1% of one).

    Estimate · Source: Derived from the model factory: 50 t cassava a day in, 10–15 t flour a day out (restoration model v1.4; land-use analysis b_parameters)

  • 0.3

    permanent jobs after restoration

    Estimate · Source: ESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters)

  • USD 358

    income a year for the village (at maturity)

    Estimate · Source: ESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters)

New land usehaJobsIncome/yr
Forest1.10.1USD 65
Cassava fields0.20.1USD 198
Agroforestry and fruit0.10USD 45
Eco-park and water0.50.1–
Eco-tourism0.10USD 50
Building land0––

How the tool calculates

Every input below comes from the ESMI business-plan model and the analyses behind it.

  • Cost per tonne is the national model cost (scenario C) for that waste type, multiplied by the regional factor and divided by the national factor 1.10 that is already inside it. It is a cost, not a price or fee.
  • Units needed = machine-years ÷ target years, rounded up. The first year of a site in the business plan is set-up; the tool leaves that out.
  • Land after a machine clean-up is the freed heap area. Its restoration is already inside the cost per tonne.
  • Avoided damage per site is not shown: the model gives it only for the whole country, not per hectare or per tonne.
  • Not in this tool: metals, grades, revenue from metals, margins or returns. Bricks are counted as product, not as money.
ParameterValueSource
Throughput of one 10-tonner49,640 t per unit per yearESMI business-plan key-figures model, scenario C (7 Nov 2026); a_t_jaar (10 t/h, 2 shifts, uptime)
Jobs per 10-tonner (2 shifts, reserve, cooks, administrator)26 jobs per unitESMI business-plan key-figures model, scenario C (7 Nov 2026); unit_kern
Clean-up cost, rich small heaps (incl. mercury capture)42.06 USD per tESMI business-plan key-figures model, scenario C (7 Nov 2026); cost per tonne, rich small heaps only (scenario C, 18 Nov 2026)
Clean-up cost, white heaps36.27 USD per tESMI business-plan key-figures model, scenario C (7 Nov 2026); cost per tonne, white heaps only (scenario C, 18 Nov 2026)
National location factor already inside the cost per tonne1.1 × cost per tInfrastructure analysis v3 (BPS IKK 2024), weighted by machine tonnage
Site set-up: access road, power, water, camp, fence, roof over the machine290,000 USD per siteESMI business-plan key-figures model, scenario C (7 Nov 2026); micro-level analysis: median USD 292,000 for 384 machine sites
Rich small heaps per hectare27,042 t per haESMI business-plan key-figures model, scenario C (7 Nov 2026); 16.55 Mt on 612 ha (a_mt_t1 / a_ha_t1)
White heaps per hectare144,025 t per haESMI business-plan key-figures model, scenario C (7 Nov 2026); 163.9 Mt on 1,138 ha (a_mt_t2 / a_ha_t2)
Waste rock and cover per hectare93,618 t per haESMI business-plan key-figures model, scenario C (7 Nov 2026); 204.37 Mt on 2,183 ha (a_mt_t3 / a_ha_t3)
Alluvial sand residue per hectare32,364 t per haESMI business-plan key-figures model, scenario C (7 Nov 2026); derived: 2,898.74 Mt on the remaining 89,567 of 93,500 ha
In-situ restoration: levelling, POCO in situ, sediment, planting, after-use, samples8,973 USD per haESMI national restoration model v1.4 (S2, P50); USD 839 mln for 93,500 ha (before regional factor)
Aftercare: 3 years weeding, replanting, water and growth checks750 USD per haESMI business-plan key-figures model, scenario C (7 Nov 2026); a_nazorg_ha
Residual sand that becomes bricks (bound with cement)1 share of tonnes processedESMI business-plan key-figures model, scenario C (7 Nov 2026); bricks: 49,640 t sand per unit per year
Brick mix: 70% paving, 30% batako0.7 share of sand to paving (rest batako)ESMI business-plan key-figures model, scenario C (7 Nov 2026); about 316,000 m² paving and about 1.6 million batako per unit per year
Paving: 110 kg sand per m²9.09 m² per t sandESMI business-plan key-figures model, scenario C (7 Nov 2026)
Batako: 9.2 kg sand per block108.7 blocks per t sandESMI business-plan key-figures model, scenario C (7 Nov 2026)
Mercury-bearing tromol residue in rich small heaps0.3861 share of rich heapsESMI business-plan key-figures model, scenario C (7 Nov 2026); 6.39 of 16.55 Mt (a_mt_tromol / a_mt_t1)
Restoration crews and nursery0.2 jobs per ha restored per yearESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters); restoration model: 940 jobs for ±4,700 ha a year
Planting crew capacity50 ha per crew of 10 per yearESMI national restoration model v1.4 (S2, P50)
Seedlings for forest and agroforestry1,100 seedlings per haESMI national restoration model v1.4 (S2, P50)
Carbon uptake of new forest on mine land (range 4–15)8 t CO₂ per ha per year (from year 5)ESMI national restoration model v1.4 (S2, P50); below the world mean of 13.6 for poor mine soil
Forest: upkeep, fire watch, carbon monitoring0.05 FTE per haESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters)
Carbon income to the village (8 t × USD 15 × 0.8 × 0.6)60 USD per ha per yearESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters)
Cassava yield on restored land (range 8–20)13 t fresh roots per ha per yearESMI national restoration model v1.4 (S2, P50)
MOCAF flour from fresh cassava, made indoors in a factory0.25 t flour per t fresh cassavaDerived from the model factory: 50 t cassava a day in, 10–15 t flour a day out (restoration model v1.4; land-use analysis b_parameters)
Cassava growing (120–150 person-days per ha per year)0.5 FTE per haESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters)
One MOCAF factory per ±1,000 ha1,000 ha cassava per factoryESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters); factory USD 1.14 mln per 1,000 ha
MOCAF factory jobs40 jobs per factoryESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters)
Net cassava income plus MOCAF value added1,100 USD per ha per yearESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters)
Agroforestry and fruit jobs0.4 FTE per haESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters)
Net agroforestry income450 USD per ha per year (from year 4)ESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters)
Eco-park, water and wetland management (fish only after mercury tests)0.1 FTE per haESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters)
Size of an eco-tourism site70 ha per eco-tourism siteRestoration model: 100 sites on 6,980 ha
Eco-tourism jobs (range 10–25)15 jobs per siteESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters); reference: Danau Kaolin, Belitung
Eco-tourism income to the village25,000 USD per site per year (from year 3)ESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters)
Typical clean-up time per cluster5 yearsESMI infrastructure and land-use analysis, 7 Nov 2026 (b_parameters)
Regional factors
Regionmachine routein situ
Indonesia (national average)×1.10×1.02
Sulawesi×1.13×1.00
Sumatra×1.14×1.00
Kalimantan×1.03×1.05
Bali and Nusa Tenggara×1.08×1.10
Maluku×1.05×1.18
Java×0.99×0.99
Papua×1.62×1.80
Aceh×1.19×1.12
North Sumatra×0.98×0.99
West Sumatra×1.07×1.14
Riau×1.09×0.97
Jambi×1.09×0.98
West Java×1.01×1.09
Central Java×0.96×1.03
Yogyakarta×0.97×1.01
East Java×0.99×0.94
West Nusa Tenggara×1.08×1.10
West Kalimantan×1.21×1.07
Central Kalimantan×1.33×1.05
South Kalimantan×1.03×1.03
North Sulawesi×1.05×1.03
Gorontalo×1.16×1.00
Central Sulawesi×1.01×0.92
North Maluku×1.37×1.27
Central Papua×1.45×1.74

Source: ESMI infrastructure and land-use analysis v3, 7 Nov 2026: location factor per island group and province (roads, grid, brick market, supplies, wages; BPS IKK 2024).

Get a full site plan

A real plan starts with the site: drone, DEM, XRF screening, lab tests, people and permits. We make it with the regency and the community.

Gotong royong

The pilot is under way. The next step is scale.

The pilot in Bolmong has started. ESMI is now raising large-scale funding to clean up Indonesia’s mine waste. Investors can start with one 10-tonner (USD 1.7 million).

ESMI also works as a hired partner. Mining companies and cooperatives can bring in ESMI to upgrade an existing plant with its microbes and methods, so it recovers more and can move away from mercury and cyanide.