Skip to content
ESMIEco Sustainable
Mining Initiative
Language

Mine waste and tailings

46,900 gold-mining waste areas: how they were counted from space

ESMI combined satellite archives, land-cover maps and an AI scan, then tested it blind. How gold-mine waste was counted, and where the count is weak.

ESMI editorial team · Published · 3 min read

Satellite image of the Morowali–Bahodopi nickel area in 2026: green forest cut by orange mining roads and pits, with an industrial park on the coast
Satellite image of the Morowali–Bahodopi nickel area in 2026: green forest cut by orange mining roads and pits, with an industrial park on the coast

A clean-up needs a number

Gold mining has left waste across Indonesia: heaps, pits and bare ground. Cleaning it up needs a number. How many areas are there, how big are they, and who is responsible?

ESMI answered with satellites. Its estimate is about 46,900 real gold-mining waste areas, on about 93,500 ha. It is a model-based national estimate, and the way it was made is open to check.

Four sources, none enough alone

The method combines open archives and published maps:

  • Sentinel-2 and Landsat. Free imagery of all of Indonesia: Sentinel-2 every few days at 10 m detail since 2016, and the Landsat archive back to 1990. ESMI builds one cloud-free picture per year, 36 years of images per place.
  • MapBiomas Indonesia, 1990 to 2025. A published yearly land-cover map. It shows what a site was before mining and in which year it turned into a mine.
  • JRC Tropical Moist Forest. The European Commission's yearly record of forest since 1990, used to count forest cleared inside the mining areas.
  • An AI scan of the whole country. An image model scored 54,682 possible gold-waste sites, plus coal, nickel, tin and copper. Each site gets a chance of being real, not a yes or no.

The blind check

A scan is only useful if it is tested. ESMI drew a random sample of 500 sites that were never used in training and had them judged blind. In that sample 88% of the judgeable sites were real mining ground (83 to 92%).

There is a limit to state plainly. The same AI model judged every site twice, so this is an automated assessment, not a check by two independent assessors. Human checking follows: Universitas Islam Malang (Unisma) will review a pre-drawn sample of 360 sites blind, and teams will visit 540 points in the field, with samples going to the accredited Unisma lab.

Where the count is weaker

Detection is weaker in Sulawesi and Java, where mines are small and mixed with villages and fields. There only 26 to 33% of flagged sites were real, so ESMI calibrates per island group. Years before 2016 are rough, because Landsat pixels are 30 m and clouds get in the way. A satellite also sees bare ground, but it cannot date when digging began: "first seen" is not "created".

What the count shows

  • About 46,900 real waste areas on about 93,500 ha of gold-mine waste land.
  • About 92% of that land lies outside any permit, so no permit holder is obliged to clean it up.
  • 46% of waste sites first appeared on satellite images after 2020. The waste is growing.
  • Bare gold-mining ground roughly doubled between 2020 and 2025, from about 9,900 ha to 20,500 ha. This is a trend measure, so its level is lower than the national total.
  • Inside the mining areas, an expected 219,100 ha of tropical forest was cleared between 1991 and 2025.

What a satellite cannot see

A satellite sees the surface. What is inside a heap, and how toxic it is, can only be measured on the ground. That is why field and lab work with Unisma comes next, and why every figure here names its source.

Explore the films and the method on Evidence from space, the tables in Indonesia in data, and the consequences on the problem page.

Sources

  1. ESMI national mine-waste report v3.1 (Nov 2026), via Evidence from space: method and blind check
  2. ESMI Indonesia in data: gold waste areas, permits, scan reliability
  3. ESMI blind sample of 500 sites (automated assessment, human check with Unisma to follow)
  4. ESMI bare gold-mining ground, Sentinel-2 trend measure 2020 to 2025

All news

The first ESMI 10-tonner is planned for 2027

It cleans gold-mine waste on site: mercury is made solid and removed, cyanide is broken down and the sand becomes bricks.

See the 10-tonner